 |
|
 |
| BEFORE |
|
AFTER |
| |
|
|
 |
|
|
| Built a small 4' X 6' porch framed with P/T and I sheathed with Hemlock including the railings. |
|
Replaced rotted clapboards and rotted sheathing, installed typar and
flashing and trim. |
| |
|
|
 |
|
 |
| BEFORE |
|
Removed old ramp and built a 10' X 18' deck out of pressure treated
lumber. |
| |
|
|
 |
|
 |
| WORK IN PROGRESS. |
|
Built 30' handicap ramp to meet the ADA regulations 1" rise for every foot in length. |
| |
|
|
 |
|
 |
| Floor to ceiling Pine built in bookcases. |
|
Floor to ceiling Pine built in bookcases. |
| |
|
|
 |
|
 |
Finished basement: built walls form laundry room and bathroom,
drywall, mud, install trim and doors. Customer wanted to paint themselves. |
|
Finished basement: built walls form laundry room and bathroom,
drywall, mud, install trim and doors. Customer wanted to paint themselves. |
| |
|
|
 |
|
 |
| WORK IN PROGRESS. |
|
Built 16' X 20' deck with Trex composite decking and trademark railing system. |
| |
|
|
 |
|
 |
| BEFORE |
|
Removed metal hatch way and built dog house, insulated and sheathed with OSB. I installed (2) new doors. I also rebuilt the cellar
stairs, repaired and painted concrete. |
| |
|
|
 |
|
 |
| BEFORE |
|
Removed metal hatchway, built dog house, applied vinyl siding, and
asphalt roof, insulated, hung drywall, built stairs, painted, installed door
and trim work. Painted concrete. |
| |
|
|
 |
|
|
| |
|
|
 |
|
 |
| BEFORE |
|
Removed small piece of Corian and built breakfast bar out of 100%
Cherry lumber and applied (5) coats of polyurethane. |
| |
|
|
 |
|
 |
| Stairs going down to the water with one small platform in W. Bath, Maine 16' rock ledge. |
|
New window and vertical blinds and trim work. |
| |
|
|